The industrial companies involved in the research project “FastCharge†yesterday presented the latest advancements in the field of fast and convenient energy supply for electrically powered vehicles. The prototype of a charging station with a capacity of up to 450 kW was inaugurated in Jettingen-Scheppach, Bavaria. At this ultra-fast charging station, electrically powered research vehicles created as part of the project are able to demonstrate charging times of less than three minutes for the first 100 kilometres of range or 15 minutes for a full charge (10-80 % State of Charge (SOC)).
The new charging station can be used free of charge right away and is suitable for electric models of all brands with the Type 2 version of the internationally widespread Combined Charging System (CCS), as is commonly used in Europe.
The research project “FastCharge†is being run by an industry consortium under the leadership of the BMW Group; its other members are Allego GmbH, Phoenix Contact E-Mobility GmbH, Dr. Ing. h. c. F. Porsche AG and Siemens AG. “FastCharge†is receiving total funding of EUR 7.8 million from the Federal Ministry of Transport and Digital Infrastructure. The implementation of the funding directives is being coordinated by NOW GmbH (National Organisation Hydrogen and Fuel Cell Technology).
Fast and convenient charging will enhance the appeal of electromobility. The increase in charging capacity up to 450 kW – between three and nine times the capacity available at DC fast-charging stations to date – enables a substantial reduction in charging times.
“FastCharge†is investigating the technical requirements that need to be met in terms of both vehicles and infrastructure in order to be able to tap into these extremely high charging capacities.